Please see the table below to see how connected load impacts bills in your state (the data is collected from tariff orders from various state electricity regulatory commissions and is only for LT (Low Transmission) domestic connections in urban areas):
State Impact
Andhra Pradesh 1) Slab rates are different for connected load less than 0.5 kW and more than 0.5 kW
2) Meter Rent is Rs 25 for single phase connection for connected load less than 0.5 kW and is Rs 50 for connected load more than 0.5 kW.
3) Meter Rent is Rs 150 for Three Phase Connection.
Arunachal Pradesh 1) Minimum Monthly Charge is Rs 32 per kW of connected load for Single Phase Connection
2) Minimum Monthly Charge is Rs 53 per kW of connected load for Three Phase Connection.
Assam 1) Fixed Charges are Rs 30 per kW of connected load.
Bihar 1) For Single Phase connection with upto 7 kW of connected load, fixed charges are Rs 50 for 1st kW and additional Rs 15 for each additional kW. Minimum Monthly Charges are Rs 40 for 1st kW and Rs 20 for each additional kW.
2) For Three Phase connection with 5 kW to 20 kW connected load, fixed charges are Rs 230 for 1st 5 kW and additional Rs 15 for each additional kW. Minimum Monthly Charges are Rs 40 for 1st kW and Rs 20 for each additional kW.
Chattisgarh 1) Single phase connection is for upto 2 kW load and monthly minimum charges are Rs 30.
2) Three phase connection is from 2 kW to 20 kW load and monthly minimum charges are Rs 100
Goa 1) Monthly Minimum Charges are Rs 20 for first 0.5 kW and Rs 15 for each additional 0.5 kW.
Gujarat 1) Fixed charges are Rs 5 if connected load is less than 2 kW. Rs 15 if connected load is between 2 to 4 kW. Rs 30 if connected load is between 4 to 6 kW. And Rs 45 for load above 6kW.
Gujarat - Ahmedabad Fixed Charges are Rs 10 for single phase and Rs 30 for three phase connections.
Gujarat - Surat Fixed Charges are Rs 10 for single phase and Rs 30 for three phase connections.
Haryana Fixed Charges are Rs 80 per kW for 1st 2 kW and additional Rs 50 per kW after 2 kW.
Himachal Pradesh Fixed Charges is Rs 30 irrespective of connected load.
Jammu and Kashmir Monthly Minimum Charges are Rs 15 for load between 0 and 0.25, Rs 25 for load between 0.25 and 0.5, Rs 40 for load between 0.5 and 1 and Rs 40 per kW for load above 1 kW.
Jharkhand For connected load less than 4 kW Rs 40 if consumption is less than 200 units and Rs 60 if consumption is more than 200 units. Fixed charges of Rs 100 for connected load above 4 kW.
Karnataka Rs 25 for 1st kW and Rs 35 per kW for every additional kW of connected load.
Kerala Fixed Charges of Rs 20 per month for single phase connection and Rs 60 per month for three phase connection.
Madhya Pradesh No impact of connected load.
Maharashtra Fixed charges of Rs 40 for single phase connection and Rs 130 for three phase connection.
Mumbai -Tata and Reliance No fixed charges for single phase connection. Rs 100 per every 10 kW (rounded to 10 kW) for three phase connection.
Mumbai - BEST For single phase connections: Rs 40 if consumption is less than 100 units. Rs 75 if consumption is between 101 and 500 units and Rs 100 for consumption over 500 units. For three phase connection Rs 150 per every 10 KW (rounded to 10 KW).
Manipur Fixed Charges of Rs 60 per kW of connected load.
Meghalaya Fixed Charges of Rs 30 per kW of connected load.
Mizoram Fixed Charges of Rs 25 per kW of connected load.
Nagaland Fixed Charges of Rs 10 plus Rs 100 for every kW of connected load.
New Delhi Rs 40 for connected load of 0 to 2 kW. Rs 100 for connected load of 2 to 5 kW and Rs 20 per kW for connected load above 5 kW.
Odisha Rs 20 for 1st kW of connected load and additional Rs 15 for every additional kW.
Punjab Monthly Minimum Charges are Rs 46 per kW.
Rajasthan Minimum Fixed charge of Rs 160 per month for consumption less than 150 units, Rs 175 per month for consumption between 150-300 units and Rs 210 per month for consumption more than 300 units.
Sikkim No impact of connected load.
Tamil Nadu No impact of connected load. Fixed Charges based on units consumed.
Tripura Fixed Charges of Rs 40 per kW for Three phase supply (connected load more than 3 kW)
Uttar Pradesh Fixed Charges of Rs 65 per kW of connected load
Uttarakhand Fixed Charges of Rs 30 per month for connected load less than 4 kW and Rs 80 per month for connected load more than 4 kW.
West Bengal Fixed Charges of Rs 30 per kW of connected load.
West Bengal - Kolkata - CESC Fixed Charges of Rs 10 per kW of connected load.
Chandigarh No impact of connected load.
Source: Latest Tariff Orders (for 2012) from various state electricity regulatory commisions' websites